Betriebsergebnis Veränderung Datum
3i Infrastructure GBP 280M 101M 2025-12
Asian Total Return GBP 78.13M 52.47M 2025-12
Centrica GBP 199M 258M 2025-12
E.ON EUR 2.04B 890M 2026-09
EDP Renovaveis EUR 237M 24.77M 2026-03
Enagas EUR 97.63M 42.55M 2026-09
Enel EUR 1.17B 806M 2026-06
ENGIE EUR 5.48B 1.86B 2026-06
EYDAP EUR 6.54M 2M 2024-12
Iberdrola EUR 2.42B 215.5M 2026-09
National Grid GBP 2.15B 1.28B 2026-12
Orsted A/S DKK 3.71B 926M 2026-09
Pennon GBP 158.6M 79.6M 2025-12
Redeia Corporacion SA EUR 196.22M 48.01M 2026-09
REN EUR 120.88M 7.77M 2025-06
RWE EUR -1.74B 3.12B 2026-09
Severn Trent GBP 306.3M 8.5M 2025-06
Snam EUR 519M 24M 2026-09
SSE GBP 1.11B 293.6M 2026-12
Terna Rete Elettrica Nazionale EUR 442M 54.6M 2026-09
Thessaloniki Water And Sewage EUR 4.19M 825K 2026-06
United Utilities GBP 633.8M 71.8M 2026-12
Vestas EUR 483M 36M 2026-09